Site Road Gantry Design and Manufacture

A J specialist welding were tasked with the design and supply of a gantry to span over an existing site road. The main objective was to provide a steel structure capable of fixing adequate road signs for site traffic management…

Wooden Conveyor Walkway Flooring Replacement

Bulls Lodge Quarry – Hanson Aggregates A J Specialist Welding have recently undertaken a major project for Hanson Aggregates at their Bulls Lodge site for the replacement of the wooden conveyor walkway and wooden kick flats on their conveyor systems…

Abrasion Resistant Wear Plate Replacement

Wear plate or liners are used to prevent damage due to abrasion or impact to machinery, therefore, prolonging the life of the original equipment. Chrome Carbide, Mild Steel and Abrasion Resistant Material AR Plates can be made from different types…

Bucket Repair Caterpillar 972M

One of our projects through our Coalville works was a total overhaul of a CAT972M bucket that is used in the quarrying industry for handling and reloading processed aggregates. Lafarge Tarmac Mountsorrel Quarry Leicestershire The bucket was collected from the…

Chrome Carbide Wear Plate Digger Bucket Repairs

A J Specialist Welding has experience in the construction and quarry industries and offer Digger Bucket Repair globally and UK Nationwide. Our Abrasion Wear Plate repairs are of a superior and extremely high quality and on average AJS Carbide Wear…

Covid-19 March 2020 Update

Due to recent events A J Specialist Welding have taken government advice and closed the workshop and office at both sites to protect the health and welfare of our staff and their families. Our office staff are working remotely from…

Ratcliffe Power Station Conveyor Drum Repair

A J Specialists received a phone call from Ratcliffe power station regarding a vital conveyor drum that had been taken out of service due to unacceptable wear on the main drive shaft. AJS urgently attended the site to access the…

Christmas and New Year Closing 2018

Festive Hours for AJ Specialist Welding 2018/19 Our hours over the Christmas period are: closed from 12 pm on December 24th, re-open on January 2nd 2019 for business as usual. Have a fun and safe festive holiday and a celebratory…

Quarry Chute Design, Manufacture and Fit

Quarry Chute Design, Manufacture and Fit

AJ Specialist’s latest turnkey project was to design, manufacture, fit wear liners, deliver and install a chute for Croft Quarry. From concept to installation took 10 weeks in total. The scope of works was to allow material from a mobile…